OUR KNOW HOW

... completing custom implementation of projects using the following steps.

01

ANALYSIS

With a personal approach and years of experience with similar projects, we ask you the right questions, which we then analyze all together based on our experience.

02

Design

Creation process
– design – calculations
– simulation – inspection

03

PRODUCTION

3.1 Material certificates, calibration; G 2.5 precise casting; non-destructive tests (ASME / EN) RT, UT, PT, VI; Paint shop (C3, C4, C5)

04

TESTING

Testing in accordance with ISO9906, according to API610 / API685 requirements. Power levels (350kW - 400V / 1.5MW - 6.3kV). Maximum flow rate: 12,000 m3/h. Routine tests prior to shipment / Prototype Pump Tests / Acceptance Tests (Bureau Veritas, TUV, Loyd) / Simulating Critical Situations in Actual Project Layout / Demonstration of suction capacity NPSH3 / Vibrodiagnostic Measurements / Test of Autonomous Unit Control Function / Test of Unit Signaling Function for DCS

05

DOCUMENTS AND CERTIFICATES

RDDS (form, content, order, language and deadline) documentation according to the client's requirements; Complete Russian TP TC certification; ATEX; ISO9001; ISO14001; ISO18001

06

FINANCIAL INSTRUMENTS

Securing in the form of issued bank guarantees or letters of credit (incl. documentary payment instruments).

07

SERVICING

Coverage of all projects by our own technicians; vibration diagnostics; laser alignment

Results of our work

  • Type: CS2 80-200
  • Flow: Q = 62 m3/h
  • Discharge head: H = 41 m
  • Media: Kerosene
  • Density: 661 kg/m3
  • Viscosity: 0,23 cP
  • Temperature: 193°C
  • Seal system: 53B

Project and User: Basrah Crude Oil Distillation No.4
Unit, LPG Unit and Boilers, Basrah, Iraq

3D